Land Use – Preliminary and Final Site Plans & Amended General Development Plan

Agenda for the meeting

05-28-2020 Land use board – Via Virtual Conference Call ONLY

 

AMENDED REDEVELOPMENT Revised_Final Adopted Plan_2020 01 08_revMar12

 

05-28-2020 LUB BRIDGE APPLICATION SITE PLAN

5 OVERALL SITE PLAN

6 SITE PLAN ‘A’

7 SITE PLAN ‘B’

8 SITE PLAN ‘C’

9 GRADING PLAN ‘A’

10 GRADING PLAN ‘B’

11 GRADING PLAN ‘C’

12 GRADING INSET PLAN ‘A’

13 GRADING INSET PLAN ‘B’

14 GRADING INSET PLAN ‘C’

15 STORMWATER PLAN ‘A’

16 STORMWATER PLAN ‘B’

17 STORMWATER PLAN ‘C’

18 UTILITY PLAN ‘A’

19 UTILITY PLAN ‘B’

20 UTILITY PLAN ‘C’

21 LANDSCAPE PLAN ‘A’

22 LANDSCAPE PLAN ‘B’

23 LANDSCAPE PLAN ‘C’

24 LIGHTING PLAN ‘A’

25 LIGHTING PLAN ‘B’

26 LIGHTING PLAN ‘C’

27 SOIL EROSION & SEDIMENT CONTROL PLAN ‘A’

28 SOIL EROSION & SEDIMENT CONTROL PLAN ‘B’

29 SOIL EROSION & SEDIMENT CONTROL PLAN ‘C’

30 STORM SEWER PROFILES

31 STORM SEWER PROFILES

32 STORM SEWER PROFILES

33 STORM SEWER PROFILES

34 SANITARY SEWER PROFILES

35 SITE PLAN

36 GRADING PLAN

37 GRADING INSET PLAN

38 STORMWATER PLAN

39 UTILITY PLAN

40 LANDSCAPE PLAN

41 LIGHTING PLAN

42 SOIL EROSION & SEDIMENT CONTROL PLAN

43 STORM SEWER PROFILES

44 SANITARY SEWER PROFILES

43 STORM SEWER PROFILES

46 RAND BOULEVARD SITE PLAN ‘B’

47 SITE PLAN

48 RAND BOULEVARD GRADING PLAN ‘A’

49 RAND BOULEVARD GRADING PLAN ‘B’

50 GRADING PLAN

51 GRADING INSET PLAN

52 RAND BOULEVARD STORMWATER PLAN ‘A’

53 RAND BOULEVARD STORMWATER PLAN ‘B’

54 STORMWATER PLAN

55 RETENTION BASIN SOUTH GRADING & STORMWATER PLAN

56 RAND BOULEVARD UTILITY PLAN ‘A’

57 RAND BOULEVARD UTILITY PLAN ‘B’

58 UTILITY PLAN

59 RAND BOULEVARD LANDSCAPE PLAN ‘A’

60 RAND BOULEVARD LANDSCAPE PLAN ‘B’

61 LANDSCAPE PLAN

62 RAND BOULEVARD LIGHTING PLAN ‘A’

63 RAND BOULEVARD LIGHTING PLAN ‘B’

64 LIGHTING PLAN

65 RAND BOULEVARD SOIL EROSION & SEDIMENT CONTROL PLAN ‘A’

66 RAND BOULEVARD SOIL EROSION & SEDIMENT CONTROL PLAN ‘B’

67 SOIL EROSION & SEDIMENT CONTROL PLAN

68 STORM SEWER PROFILES

69 STORM SEWER PROFILES

70 STORM SEWER PROFILES

71 STORM SEWER PROFILES

72 SANITARY SEWER PROFILES

73 SANITARY SEWER PROFILES

74 RAND BOULEVARD PROFILE ‘A’

75 RAND BOULEVARD PROFILE ‘B’

76 CONSTRUCTION DETAILS

77 CONSTRUCTION DETAILS

78 CONSTRUCTION DETAILS

79 CONSTRUCTION DETAILS

80 CONSTRUCTION DETAILS

81 CONSTRUCTION DETAILS

82 CONSTRUCTION DETAILS

83 OVERALL SIGN EXHIBIT

84 GREEN SPACE PLAN

85 BUILDINGS 3, 5 & 6 OVERALL HYDRANT LOCATION PLAN EXHIBIT

86 TRAFFIC CONTROL PLAN

87 WARREN STREET BASIN

1 COVER SHEET

2 VICINITY MAP

3 AERIAL MAP

4 GENERAL NOTES4 GENERAL NOTES

 

GENERAL  DEVELOPMENT PLAN AMENDED

 

AMENDED GDP Application

01 COVER SHEET

02 ORIGINAL LANDS WITHIN REDEVELOPMENT PLAN

03 PROPOSED LANDS WITHIN REDEVELOPMENT PLAN

04 GENERAL DEVELOPMENT PLAN

05 PHASING PLAN

06 CIRCULATION PLAN

07 GREEN SPACE RECREATION BUFFER PLAN

08 CONCEPTUAL STORMWATER MANAGEMENT PLAN

09 CONCEPTUAL SANITARY SEWER PLAN

10 CONCEPTUAL WATER SYSTEM PLAN

11 CONCEPTUAL ELECTRICAL DISTRIBUTION PLAN

12 SOILS MAP

13 ENVIRONMENTAL CONSTRAINTS PLAN

14 PROPOSED ENVIRONMENTAL CONSTRAINTS PLAN

Dynamic-Bridge-I78-Overall-Electric

 

 

 

 

 

 

 

 

 

 

 

Upcoming Events

  1. UEZ Special Meeting

    June 2 @ 6:00 pm - 7:00 pm
  2. TOWN COUNCIL MEETING TENTATIVE

    June 3 @ 7:00 pm - 9:30 pm
  3. TOWN COUNCIL WORK SESSION TENTATIVE

    June 9 @ 7:00 pm - 9:30 pm